|
Photo Gallery |
![]() |
|
| 25000 kg / 55000 lbs - Double box girder top running Variable speed bridge and hoist travel - 55' / 16.5 meter span |
4 Crane Installation - 40000 kg / 88000 lbs - Double Box girder girder top running - 78' / 24 meter span - Variable speed bridge, trolley, and hoist motions - Power rotating hook block - Operator cabs - Bridge catwalk - Class E service duty |
| 2 - 5000 kg / 11000 lbs - single girder under running - 3
point suspension - 98' / 30 meter span
|
4 Crane Installation: 2 - 5000 kg / 11000 lbs - Single girder top running 1 - 8000 kg / 17600 lbs - Single girder top running |
| 2 - 6800 kg / 15000 lbs - Single girder - under running - Free standing runway | 5000 kg / 11000 lbs - Double girder semi-gantry |
![]() |
![]() |
| 50000 kg / 110000 lbs Double Girder - 56' (17m) span Variable speed bridge and trolley - 2 speed hoisting Hoist Monitoring with Load display in pendant |
3 Crane installation: 2 - 10000 kg / 22000 lbs - Single box girder 1 - Twin hoist 2750 kg / 6000 lbs 60' (18m) spans - Variable speed bridge and trolley motions - Radio controls on all 3 cranes |
| 18000 kg / 40000 lbs Double Girder - Two speed all motions |
10000 kg / 22000 lbs - Single box girder - Variable speed bridge and trolley motions |
| 27200 kg / 60000 lbs - Double box girder - 55' span with bolted splice connections for shipping overseas |
1800 kg / 4000 lbs - Single girder under running |
![]() |
|
| 4500 kg / 10000 lbs - Single girder top running with bolted splice connection for overseas shipping |
5000 kg / 11000 lbs - Single girder top running - Variable speed bridge and trolley motions |
|
|
|
© Copyright 2008, Steelway Material Handling. All Rights Reserved |